Site Final | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Andy J. Long
|
|
|
BLD finaled, lot is landscaped and stabilzed. Temp BMPs in Highlands Cove to remain for ongoing construction. ESC permit finaled.
|
Site Preparation | 6/4/2018 | 6/4/2018 | 6/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is on bottom in flat area for development. Wattle protecting lot on downhill side. Neighborhood BMPs in place. Conner Construction is developer and this lots builder. Outpaks are used for washout.
|
Issue & PRINT permit SFD | | | 6/1/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/16/2018 | | 5/16/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Certified RP designated. Site preparation inspection required.
|
Application received | | | 5/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2018 11:23AM
|