General Inspection | 7/14/2020 | 7/14/2020 | 7/14/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 5/29/2020 | 5/29/2020 | 5/29/2020 | | PASS |
Michael Zawacki
|
|
|
Most exterior work and disturbances completed. Site has mortar mixer that has liner and ecopan. Lots of materia stored around Front. DI protection installed and clean. No issues.
|
General Inspection | 4/13/2020 | 4/13/2020 | 4/13/2020 | | PASS |
Michael Zawacki
|
|
|
Parking garage is operational, entrance off of 5th. ^th street has major work going on performed by ACHD bid. Job site is all secure. Masons on exterior, some trenchwork. Foam insulation blocks on site, none loose or blowing. No issues at site.
|
General Inspection | 2/25/2020 | 2/25/2020 | 3/2/2020 | | PASS |
Andy J. Long
|
|
|
No discharges or trackout from perimeter. 5th street area has been stabilized except for construction access. Receiving storm drain has sediment protection.
|
General Inspection | 1/10/2020 | 1/10/2020 | 1/10/2020 | | PASS |
Michael Zawacki
|
|
|
Talkjed with Adam. Had a spill moving ecopan and are on it getting cleaned. No issues at site besides washout.
|
General Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PART |
Andy J. Long
|
|
|
No signficant trackout, no discharges. Permit posted on 6th street. Site using Ecopan for concrete washout.
Corrections requested to RP Adam: - sweep gutter on 5th street - fix DI bag installed on storm drain on 5th at Front (west side of street)
Follow up scheduled.
|
General Inspection | 11/11/2019 | 11/11/2019 | 11/12/2019 | | PASS |
Andy J. Long
|
|
|
Perimter BMPs installed, permit posted. No trackout. Concrete washout bins are onsite. No corrections requested at this time
|
Complaint Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | FAIL |
Andy J. Long
|
|
|
Concrete pump trucks are leaking oils and other materials onto 5th street and do not have drip pans or spill kits.
Notified RP Adam with ESI and called Parnell w/ Brundage Bone. He stated his mechanic will be focusing on the two trucks that are going to the site and will make sure they have drip pans/spill absorbent.
Follow up scheduled.
|
General Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | | DONE |
Michael Zawacki
|
|
|
Will follow up next week on spill and cleanup of concrete.
|
General Inspection | 7/29/2019 | 7/29/2019 | 8/1/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 6/7/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Andy J. Long
|
|
|
follow up on corrections
6th Street gutter and access cleaned up. Construction entrance has not yet been approved, but gate has been shut. No discharges, trackout, or fugitive dust observed.
|
General Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PART |
Andy J. Long
|
|
|
RP on site, permit sign posted, storm drains have sediment protection.
Corrections needed:
- clean up spilled washout on 6th street entrance and dried slurry in gutter - improve and lengthen construction entrance on 6th - relocate concrete washouts further inside of site to prevent runoff offsite.
verbal request to Adam
|
General Inspection | 5/27/2019 | 5/27/2019 | 5/28/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Stabalized entrances at both 5th and 6th. Site is free from loose trash. No dumped concrete, ecopan on site. ainlet at corner of 5th and Front not protected, traffic flow goes away from inlet. No trackout.
|
General Inspection | 4/10/2019 | 4/10/2019 | 4/16/2019 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 1/15/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Andy J. Long
|
|
|
11 Am pre-construction walk through inspection with Adam from ESI
Onsite meeting to discuss site access, construction entrance(s) and inlet protection.
Access into site will be off 5th street, plan is to have entrance out to the alley and return to 5th street to avoid 6th street traffic. Site is to begin work on the west end of the block first and move east. Will use ecopan washouts.
Dewatering not currently anticipated.
Another site preparation inspection will be completed once initial BMPs are installed.
|
Permit Ready to Issue | | | 1/11/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/11/2019 | | DONE |
|
|
|
|
Application received | | | 5/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2018 10:10AM
|