Site Final | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Andy J. Long
|
|
|
Garage complete. Area of consruction access has revegetated. ESC permit conditions satisfied.
|
Site Preparation | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Andy J. Long
|
|
|
9:30 site preparation; BMP assessment.
Andrew ###-####
On site meeting. Flat lot, detached pole barn structure in back yard surrounded by lawn. Reviewed ESC permit conditions. Post ESC permit sign, contain concrete washout, clean up any trackout.
No MS4 system, no stockpiling or loose materials in borrow ditch.
|
Issue & PRINT permit SFD | | | 7/2/2018 | | DONE |
|
|
|
|
Application received | | | 6/25/2018 | | |
|
|
|
|