Aging Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/2/2018 | 8/6/2018 | 8/6/2018 | A | CANC |
Andy J. Long
|
|
|
inspection/conference conducted 8/3
|
General Inspection | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Andy J. Long
|
|
|
11 AM
Perimeter wattle installed. RP onsite. Permit sign to posted on the south property line fence. Replace existing storm drain and underground seepage with a new and improved system as well sidewalk and gutter. This permit was the SFH demo but now RP is Steve with CMG.
|
Conference | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | DONE |
Andy J. Long
|
|
|
Open ESC permit for SFH demolition will also be used to cover some ongoing site work on the parcel, including a new drainagage swale and some sidewalk improvements in the ROW. RP will be Steve Sears w/ CMG
|
(F) Reprint permit | | | 8/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2018 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/9/2018 | | DONE |
|
|
|
|
Application received | | | 6/26/2018 | | |
|
|
|
|