Site Final | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Andy J. Long
|
|
|
Concrete washout dumped has been cleaned up as requested. No temporary BMPs remaining. Area is stabilized as temporary parking lot.
ESC permit finaled.
|
Site Final | 1/29/2019 | 1/29/2019 | 1/31/2019 | P | FAIL |
Andy J. Long
|
|
|
Jason Phone #: ###-####
Need to clean up the concrete washout dumped on site before final.
|
Random Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on construction on temporary parking lot. Surrounding storm drains have sediment filter bags installed. No trackout. Will need to watch fugitive dust.
|
Issue & PRINT permit COM | | | 10/12/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/2/2018 | | 7/2/2018 | | DONE |
Michael Zawacki
|
|
|
Valid RP required before ground disturbing activity.
|
Application received | | | 6/27/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2018 4:07PM
|