Site Final | 10/3/2019 | 10/8/2019 | 10/9/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/3/2019 | 10/3/2019 | 10/3/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | | PASS |
Michael Zawacki
|
|
|
Home is completed and landscaped. Still some bare areas beyond landscaping, wattles still installed.
|
General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | | PASS |
Michael Zawacki
|
|
|
Crew finishing pavers on drive and walkway. Site has no landscaping, area is clean.
|
General Inspection | 8/14/2019 | 8/14/2019 | 8/15/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/12/2019 | 7/12/2019 | 7/12/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | PART |
Michael Zawacki
|
|
|
Site now has vegetative buffer of weeds. Some windblown trash needs to be picked up.
|
General Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/31/2018 | 9/7/2018 | 9/11/2018 | A | PASS |
Michael Zawacki
|
|
|
Gap between wattle and silt fence
|
Site Preparation | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Andy J. Long
|
|
|
Erosion and Sediment Control Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
Initial BMPs installed. Approved for construction.
Correction request to RP Clayton to reinstall and stake in wattles on back slope of lot. Clean up discarded at bottom of hill.
Follow up inspection scheduled for next week
|
Permit Ready to Issue | | | 8/30/2018 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 8/30/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/2/2018 | | 8/2/2018 | | DONE |
Andy J. Long
|
|
|
ESC site map with project narrative approved. Certified stormwater team designated. Site preparation inspection is required.
|
Application received | | | 7/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 20 2018 10:41AM
|