Site Final | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Andy J. Long
|
|
|
parking lot and landscaping complete. No temporary BMPs or disturbed area on site. ESC permit finaled.
|
General Inspection | 6/28/2019 | 6/28/2019 | 6/28/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Andy J. Long
|
|
|
Parking lot has asphalt paving and curbing installed. Striping and tree plant is yet to be completed. Site is clean. No loose debris or trackout. No activity at time of inspection
|
General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on parking lot grading. ESC permit pulled for demolition is now closed. No trackout. Permit sign posted with ESCP information. Perimeter vegetation and curbing preserved. Road base entrance already prepped, no traffic in and out of site.
Approved.
|
Issue & PRINT permit COM | | | 9/28/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/13/2018 | | 9/13/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Certified RP desiganted. Site preparation inspection required.
|
Application received | | | 8/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 7 2018 12:24PM
|