Site Final | 8/19/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/19/2019 | | PASS |
Andy J. Long
|
|
|
Home near completion. Grass where concrete washout was dumped and spilled is brown and not growing well. No discharges or material leaving site. Will follow up for site final next week.
|
General Inspection | 7/31/2019 | 7/31/2019 | 8/1/2019 | | PASS |
Michael Zawacki
|
|
|
Home exterior looks completed. Landscapers have just begun, no issues.
|
General Inspection | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PASS |
Michael Zawacki
|
|
|
Silt fence has been repaired protecting neighboring lot. Lots of stucco fallen around site. No problems with loose or blowing trash.
|
General Inspection | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | PEND |
Andy J. Long
|
|
|
trash was emptied, washout residue and dried slurry still on site.
|
BMP Violation | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | FAIL |
Andy J. Long
|
|
|
Overflowing trash containment. Uncontained concrete washout dumped next to trash container, debris and slurry on sidewalk.
Correction requests: - empty trash containment - clean up sidewalk - clean up piles of dumped material and remove contaminated soil
|
General Inspection | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | PART |
Michael Zawacki
|
|
|
Correction sent to RP. Silt fence in front needs sediment cleaned out, rear right needs repairs. Trash all in box, wood scraps in pile next to box. No dirt leaving site at time of inspection.
|
General Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PART |
Michael Zawacki
|
|
|
Sidewalk and street in front of lot can be swept a bit better.
|
Tracking Control | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Andy J. Long
|
|
|
Trackout cleaned up. Will need to reinstall perimeter wattles and protect downhill home.
|
Complaint Inspection | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | FAIL |
Andy J. Long
|
|
|
Extreme trackout and muddy sidewalk, perimeter controls damanged, no stabilized access.
Verbal correction request to clean up and repair BMPs to Canyon Crest RP Dave. Follow up scheduled.
|
Site Preparation | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Michael Zawacki
|
|
|
Silt fence installed on downhill perimeter, gator guard along sidewalk. Load of pitrun delivered, some is on sidewalk. Work not scheduled to begin until monday, will need washout before pour.
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/12/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/13/2018 | | 9/13/2018 | | DONE |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Application received | | | 8/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2018 1:49PM
|