General Inspection | 1/28/2020 | 1/28/2020 | 1/28/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Michael Zawacki
|
|
|
ESC18-00659 still open and is main site permit. All buildings completed, frontage along Fairview is still bare.
|
Site Final | 12/2/2019 | 12/13/2019 | 12/17/2019 | P | NR |
Andy J. Long
|
|
|
|
General Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | | PASS |
Michael Zawacki
|
|
|
Inside the site is all paved and landscaped. New washout on southern lot, also a stockpile of debris.
|
General Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | | CANC |
Michael Zawacki
|
|
|
|
Permit Ready to Issue | | | 1/11/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/11/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/11/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/16/2018 | | 10/16/2018 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid stormwater team designated. Site already started under GRD18-00035, no site prep required.
|
Application received | | | 9/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2018 1:00AM
|