Site Final | 3/20/2020 | 3/20/2020 | 3/24/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 2/18/2020 | 2/18/2020 | 2/19/2020 | | PASS |
Michael Zawacki
|
|
|
Building is completed, parking lot done. Gate was locked.
|
General Inspection | 1/17/2020 | 1/17/2020 | 1/17/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | | PASS |
Andy J. Long
|
|
|
No trackout or discharges.
|
General Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | | PASS |
Michael Zawacki
|
|
|
Entire site below grade of Orchard. Rear pavement has been removed and is below grade of runways. Lots of dirt on parking lot around hangar. Crew on site filling trenches. Nothing has creeped onto neighboring areas.
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Visual inspection, site on airport. Everything looks contained, nothing blowing towards orchard.
|
General Inspection | 9/25/2019 | 9/25/2019 | 9/25/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PASS |
Andy J. Long
|
|
|
No trackout. Site below grade of Orchard, surrounding by airport pavement
|
Permit Ready to Issue | | | 2/11/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/11/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/22/2018 | | 10/22/2018 | | DONE |
Michael Zawacki
|
|
|
Site prep required. Contractor responsible for providing access onto airport property.
|
Application received | | | 10/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2018 10:20AM
|