Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC18-01506
StatusFinaled
Name ERIC BELL
Site Address 1408 N GARDEN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Per Attached Conditions
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/12/20198/13/20198/12/2019PPASS
DetailsAndy J. Long
Home occupied.and landscaped. No ESC requests.
Site Final6/10/20196/11/20196/12/2019PNR
DetailsAndy J. Long
Eric Bell/call for garage code. Phone #: ###-####

RP-GC wants to final BLD permit. Site needs landscaping and final cleanup and removal of DI bag on Rim.
General Inspection3/13/20193/13/20193/13/2019PPART
DetailsAndy J. Long
No trackout or discharges from site. Posted new ESC permit on trash bin.

Corrections needed:

- pick up loose trash around site
- remove full concrete washout and other debris/material off of the canal/ditch ROW.
- provide new concrete washout containment
- sweep shoulder of Garden street in front of projects

Correction notice posted on garage door. Compliance date 3/19 12 PM. Follow up scheduled.
General Inspection1/2/20191/2/20191/3/2019PPART
DetailsAndy J. Long
Inspected 1/2 5 PM.

Concrete for garage poured. Washout used was near full. Most washout was able to be contained. Some spills around washout area and in close proximity to ditch are visible; ditch is currently dry

Correction request:
- wait for washout in container to dry, then dispose of. New washout containment will be needed for upcoming cement work.

Correction issued to RP/GC.

No other violations, trash contained. Storm drain on Rim has sediment protection.
Tracking Control12/17/201812/17/201812/18/2018PPASS
DetailsAndy J. Long
Trackout cleaned up by street sweeper before end of day as requested.

Site will continue to work on picking up any loose trash and removing the full washout contianment that is now dry.

Follow ups scheduled.
Tracking Control12/17/201812/17/201812/17/2018AFAIL
DetailsAndy J. Long
Excessive trackout from site.

No stabilized access. End of day clean up or SWO will be issued.
Site Preparation11/26/201811/26/201811/26/2018PPASS
DetailsAndy J. Long
Permit posted. Large capacity concrete washout staged on site prior to foundation. No trackout. Storm drain on Rim has sediment protection. Grassy strip maintained along irrigation ditch (dry), will reisnpect after backfill of foundation for perimeter controls.
Issue & PRINT permit SFD  11/19/2018 DONE
Application received  10/19/2018