Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC18-01531
StatusFinaled
Name BRYAN MURDOCH
Site Address 3029 N LANCASTER PL
Project Name 
Customer Number 
ePlanReviewNo
Description
New hillside zone SFH. ESC plan and site map provided. Site Preparation is REQUIRED prior to earth work. Concrete washout containment and trash control will be strictly enforced. Install perimeter waters to filter and trap sediment from any runoff that exits lot towards street.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/1/201911/8/201911/8/2019PPASS
DetailsMichael Zawacki
Talked with Bryan getting last few punch list items done.
Site Final10/29/201911/1/201911/1/2019PCANC
DetailsAndy J. Long
to be rescheduled
General Inspection10/29/201910/29/201910/29/2019 CANC
DetailsAndy J. Long
Complaint Inspection10/14/201910/14/201910/16/2019PPASS
DetailsAndy J. Long
trash

Trash bin emptied. Trash across street picked up. RP is onsite supervising finishing touches. Slope behind home is to hydroseeded/taciifed tomorrow morning.
General Inspection9/26/20199/26/20199/26/2019 PASS
DetailsAndy J. Long
WIP on final exterior work and need to landscape. No trackout, spills, or discharges observed
BMP Violation9/6/20199/10/20199/10/2019APASS
DetailsMichael Zawacki
Dumped washout has been cleaned
General Inspection9/6/20199/6/20199/6/2019PFAIL
DetailsMichael Zawacki
Washout for wall dumped. Message sent to RP.
Follow up scheduled.
General Inspection8/29/20198/29/20198/29/2019PPASS
DetailsAndy J. Long
follow up inspection for trash pick up

Trash across the street picked up as requested. Sidewalk has been swept and dumped material scooped up. Roofing in progress, crew will need to pick up all waste packing materials in culdesac at end of the day.
Conference8/29/20198/29/20198/29/2019PCANC
DetailsAndy J. Long
Complaint Inspection8/26/20198/26/20198/26/2019PFAIL
DetailsAndy J. Long
trash complaint

Loose trash is visible around site including water bottles, cans, styrofoam, construction material wrappings. Wind blown trash in grasses & weeds across the street and downhill from site.

Corrections needed:

- pick up all loose trash around site, on the adjacent lot downhill from site, in backyard, all around culdesac being used for staging. Pick up trash across the street along sidewalk from the fire hydrant up.

- scoop up piles of dumped washout and stucco, escially on lower adjacent lot. Sweep sidewalk and gutter where there is dirt/trackout visible.

Follow up inspection Tuesday PM. Notified RP, he stated trash will be picked up tomorrow. Follow up inspection scheduled.
BMP Violation7/2/20197/9/20197/9/2019APASS
DetailsAndy J. Long
If any washout dumped or not cleaned around site, issue fine and pacel hold

Washout container placed on site on top of dumped washout. Washout was utiliized. Approved.

Will still expect that the dumped material is scraped off of ground and hauled to landfill.

No discharges, trackout, or windblown trash. Minimal activity at site.
BMP Violation7/2/20197/2/20197/2/2019PFAIL
DetailsAndy J. Long
Concrete washout from retaining wall/driveway work dumped on ground . No concrete washout pit or container provided. Located next to culdesac sidewalk above site.

Clean up before Tuesday July 9 AM and provide washout container for remaining remain rinsing/washing needs.

Failure to comply will result in investigation fee and trade inspection parcel hold. Follow up scheudled.

No loose trash, trackout, or discharges. Silt fence frontage has been trampled.
General Inspection6/17/20196/18/20196/18/2019APASS
DetailsMichael Zawacki
Met with builder on site. They did trash walk and pick up on hillside behind home. Some dirt on sidewalk that they will sweep up. No trash issues or major ESC issues.
General Inspection6/10/20196/11/20196/18/2019APEND
DetailsAndy J. Long
trash follow up
Complaint Inspection6/7/20196/7/20196/7/2019PFAIL
DetailsAndy J. Long
Unserviced and overflowing trash bin caused windblown trash to be blown around culdesac and surrounding slopes during wind storm.

Correction:
- all construction trash around Win Hollow needs to be picked up. This is the only active site with a trash structure, so all trash must be assumed to be from the site
- get trash box serviced, relocate inside garage or increase frequency of service, provide a tarp or board to cover during periods of inactivity.

General Inspection5/29/20195/29/20195/29/2019PPASS
DetailsMichael Zawacki
post rain inspection
Syman crew on site replacing inlet protection.
Poly installed to catch water from roof and direct below home, silt fence catching flow. Silt fence with J-hook along front. Side lot is vacant and has some vegetation.
General Inspection5/28/20195/28/20195/28/2019PFAIL
DetailsAndy J. Long
Corrections needed:

- install perimeter sediment controls down slope from project along sidewalk and lot line to prevent muddy runoff onto sidewalks
- have trash emptied
- address significant erosion and slope damage behind home and below deck footings. Steep slopes should be protected with erosion control blankets after repair. RP stated they are going to install temporary gutters
Complaint Inspection3/22/20193/22/20193/27/2019PPASS
DetailsMichael Zawacki
Sidewalk has been removed at two locations. Concrete washout on site, extra mud was dumped on lot. Some mud on sidewalk but not bad. Street looks like it has been swept.
General Inspection3/19/20193/19/20193/19/2019PPEND
DetailsMichael Zawacki
Crews on site doing foundation work. Pump truck and multiple sunroc trucks on site. Did not see any dumped washout or washout container. A-core on site cutting curb. Area will need to be cleaned at end of day, told workers on site.
Site Preparation3/5/20193/5/20193/7/2019PPART
DetailsMichael Zawacki
Called builder never called back.
Excavation has begun. Will need to watch for runoff down hill and maintain silt fence. Wattle along front of perimeter is old and will need to be monitored. No BMPs on downhill side of lot, no permit dislayed.
Issue & PRINT permit SFD  3/5/2019 DONE
Routing - Erosion and Sediment11/14/2018 11/14/2018 PASS
DetailsAndy J. Long
ESC plan and site map approved. Certified RP and PD designated. Site preparation inspection is REQUIRED prior to earthwork.
Application received  10/24/2018