DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Andy J. Long
|
|
|
Pool complete. No disturbed area or remaining corrections. Permit finaled.
|
Site Preparation | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Pool excavated. Backfill has been used for topsoil on lot and neighboring lot. Retaining wasll has been built on down hill side, perimeter BMPs still in place.
|
Permit Ready to Issue | | | 10/31/2018 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 10/31/2018 | | DONE |
|
|
|
|
Application received | | | 10/30/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/30/2018 | | 10/30/2018 | | PASS |
Andy J. Long
|
|
|
ESCP waiver request approved. Certified RP listed. Site preparation inspection required.
|