DOC - Permit Finaled | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Backfill has been filled back in. Two row homes being built at same time. Trash box on site, some small trash and water bottles laying around site.
|
General Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Andy J. Long
|
|
|
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
|
Permit Ready to Issue | | | 8/15/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 8/15/2019 | | DONE |
|
|
|
|
Application received | | | 11/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2018 12:39PM
|