Site Final | 4/4/2019 | 4/5/2019 | 4/5/2019 | P | PASS |
Andy J. Long
|
|
|
Work complete, area stabilized. Approved.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Rockwork and channel armoring completed. Willows have been planted. Fill being placed and compacted on slopes, will all be landscaped. Backfill materials stored in park.
|
General Inspection | 1/7/2019 | 1/7/2019 | 1/11/2019 | P | PASS |
Andy J. Long
|
|
|
no construction activity yet. Equipment staged in parking lot.
|
Site Preparation | 12/24/2018 | 12/26/2018 | 12/27/2018 | A | DEFR |
Michael Zawacki
|
|
|
Left message with contractor. Stopped by location and didn't see any equipment or work.
|
Site Preparation | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | CANC |
Andy J. Long
|
|
|
RP called to notify construction is to begin on Wednesday
|
Site Preparation | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PEND |
Andy J. Long
|
|
|
Pre-construciton site meeting conducted last week. Work has not yet started. RP Rusty to notify when BMPs are installed.
|
Issue & PRINT permit COM | | | 12/17/2018 | | DONE |
|
|
|
|
Application received | | | 12/11/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/11/2018 | | 12/11/2018 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site plan approved. Certified RP and PD designated. Site preparation inspection prior to construciton is REQUIRED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 12/11/2018 | | DONE |
|
|
|
Spoke with Rusty to inform him of the fee due and that the permit is ready
|