Site Final | 4/4/2019 | 4/5/2019 | 4/10/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | FAIL |
Michael Zawacki
|
|
|
No concrete washout, dumped into pile of rubble. Left message with RP to clean and install before next pour.
|
General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Michael Zawacki
|
|
|
check on river repair work sites No trackout from staging area. No turbid discharge. Willows planted in areas where work completed. Backfill still needed behind rocks.
|
Site Preparation | 12/18/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Michael Zawacki
|
|
|
All equipment has been converted to be safe for work in river, no plans to have to drive in river at all. Material staged in lot, will monitor for trackout and improve and clean as needed. Will do daily turbidity readings and keep log. SWPPP will be kept on site in truck, advised against mailbox because chance of vandalism in high traffic area. Will post permit sign at entrance.
|
Issue & PRINT permit COM | | | 12/14/2018 | | DONE |
|
|
|
|
Application received | | | 12/13/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/13/2018 | | 12/13/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP desingated. Site Preparation Inspection is REQUIRED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/13/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2018 | | DONE |
|
|
|
called Loren to let know permit is ready-left message-also called Chris and let him know
|