Site Final | 11/14/2019 | 11/25/2019 | 11/26/2019 | P | PASS |
Andy J. Long
|
|
|
BLD finaled, project complete and stabilized. No temporary BMPs left behind.
|
Site Final | 10/29/2019 | 11/15/2019 | 11/14/2019 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Preparation | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Stormwater all stays on site. Will need to watch out for dust and trackout. OK to begin.
|
Issue & PRINT permit COM | | | 3/6/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/25/2019 | | 2/25/2019 | | DONE |
Michael Zawacki
|
|
|
RP needed. Site prep inspection required.
|
Application received | | | 12/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2018 11:52AM
|