Site Final | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Andy J. Long
|
|
|
Project complete, landscaped/stabilized. No loose materials or temporary BMPs left behind. BLD finaled.
|
Site Preparation | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | PASS |
Andy J. Long
|
|
|
10:30 AM with Josh
Reviewed ESC permit conditions with RP and crew. Permit sign posted.
Plan is to preserve existing vegetation around garage addition footprint. There is a 30 ft flat grassy buffer in backyard, no additional sediment control needed.
Regular housekeeping, permit signage, concrete washout and using existing access will be main BMPs.
Approved for construction.
|
Issue & PRINT permit SFD | | | 1/3/2019 | | DONE |
|
|
|
|
Application received | | | 12/31/2018 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/31/2018 | | 12/31/2018 | | DONE |
Michael Zawacki
|
|
|
Waiver approved, preconstruction site prep inspection required.
|