General Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Permit Ready to Issue | | | 1/7/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 1/7/2019 | | DONE |
|
|
|
Spoke with Rhett to inform him the permit is ready and what fees are due. To inform him the application for Ballantyne Ln doesnt need and ESC with us and he can pick up both sets of plans.
|
Issue & PRINT permit COM | | | 1/7/2019 | | DONE |
|
|
|
|
Application received | | | 1/4/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/4/2019 | | 1/4/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Certified stormwater team designated. Site preparation inspection is REQUIRED.
|