General Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/3/2020 | 7/3/2020 | 7/6/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/18/2020 | 6/18/2020 | 6/18/2020 | | PASS |
Michael Zawacki
|
|
|
West end of back yard still needs landscaping. No issues.
|
General Inspection | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | PASS |
Michael Zawacki
|
|
|
Silt fence still installed, backyard landscaped. Driveway to be poured tommorow, washout on site.
|
General Inspection | 5/26/2020 | 5/26/2020 | 5/26/2020 | | PASS |
Michael Zawacki
|
|
|
Home nearly completed, still needs landscaping.
|
General Inspection | 5/11/2020 | 5/11/2020 | 5/11/2020 | | PASS |
Michael Zawacki
|
|
|
Some areas of silt fence in rear under load. Site has large buffer on hillside. Lot is contained and has been kept clean.
|
General Inspection | 4/24/2020 | 4/24/2020 | 4/24/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/9/2020 | 4/9/2020 | 4/9/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/25/2020 | 3/25/2020 | 3/25/2020 | | PASS |
Michael Zawacki
|
|
|
Some areas of rear silt fence need to have sediment clearewd, no breaches. No issues at site.
|
General Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 | | PASS |
Michael Zawacki
|
|
|
Workers parked on road, trailers on lot. Washout is close to being full.
|
General Inspection | 2/21/2020 | 2/21/2020 | 2/24/2020 | | PASS |
Michael Zawacki
|
|
|
Workers parked on cul de sac. Building material stored on driveway. No esc issues.
|
General Inspection | 2/5/2020 | 2/5/2020 | 2/5/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/21/2020 | 1/21/2020 | 1/21/2020 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 1/6/2020 | 1/6/2020 | 1/6/2020 | | PART |
Michael Zawacki
|
|
|
Sent message to Noah to make sure paint and drywall crews use a washout, some thrown right out door. No major esc issues, no runoff down hill.
|
General Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | | PASS |
Michael Zawacki
|
|
|
Site clean and contained.
|
General Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | | PASS |
Michael Zawacki
|
|
|
Roofers on site, no gutters installed. Road is a mess, was trenched and hasn't been patched yet.
|
General Inspection | 11/5/2019 | 11/5/2019 | 11/5/2019 | | PASS |
Michael Zawacki
|
|
|
Clean and contained, no loose trash, no issues.
|
General Inspection | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Pool and rockwork in back are completed. No esc issues.
|
General Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Silt fence and wattle installed, hillside also has tracking. One rill from sprinklers, water running into sewer trench. No dirt leaving site, no issues.
|
Site Preparation | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Andy J. Long
|
|
|
Silt fence perimeter installed down slope of excavation. Storm drain in front of site has sediment protection. RP onsite. Noah with RCH will also be on site. Vegetation below project is preserved.
|
Permit Ready to Issue | | | 4/9/2019 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 4/9/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/1/2019 | | 2/1/2019 | | DONE |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Application received | | | 1/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 25 2019 2:35PM
|