Site Final | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Andy J. Long
|
|
|
ECB has been properly reinstalled. Site cleaned up, equipment or disturbed area. Permit paid for, ESC permit conditions satisfied.
|
Fees Due Hold | 2/14/2019 | | 4/9/2019 | | DONE |
Tisha Gallop
|
|
|
no fee due
|
Site Final | 4/4/2019 | 4/5/2019 | 4/8/2019 | A | NR |
Andy J. Long
|
|
|
Erosion control blanket has now been installed with an anchor trench at top of slope per installation instructions. No new corrections. Permit not ready for final until paid for by PW, invoice sent.
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/12/2019 | P | PASS |
Michael Zawacki
|
|
|
Work complete and stabalization in progress. People are using area to access river and walking on exposed soils.
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 2/13/2019 | | DONE |
|
|
|
Left voicemail for Mark to inform him the permit is ready and what fees are due.
|
Issue & PRINT to be Invoiced | | | 2/13/2019 | | DONE |
|
|
|
|
Application received | | | 2/12/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/12/2019 | | 2/12/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified stormwater team. Site preparation and site final inspection are required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2019 | | |
Andy J. Long
|
|
|
|