General Inspection | 7/10/2020 | 7/10/2020 | 7/10/2020 | | PASS |
Michael Zawacki
|
|
|
WIP on multiple buildings. Teneants are expected to move into a few buildings end of the month. Site is clean, areas are being watered to keep dust down, sweeper comes twice a week.
|
General Inspection | 5/25/2020 | 5/25/2020 | 5/26/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/7/2020 | 4/7/2020 | 4/7/2020 | | CANC |
Andy J. Long
|
|
|
see ESC19-00181 & ESC19-00839
|
General Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 | | PASS |
Andy J. Long
|
|
|
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.
Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.
Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
|
General Inspection | 1/1/2020 | 1/1/2020 | 1/2/2020 | | CANC |
Andy J. Long
|
|
|
see ESC19-00181
|
General Inspection | 11/13/2019 | 11/13/2019 | 11/13/2019 | | PASS |
Andy J. Long
|
|
|
See ESC19-00181 for site details and correction requests
|
Issue & PRINT permit COM | | | 8/15/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/15/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/25/2019 | | 4/25/2019 | | DONE |
Andy J. Long
|
|
|
see ESC19-00181 for details
|
Application received | | | 2/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2019 5:02PM
|