DOC - Permit Finaled | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Andy J. Long
|
|
|
see ESC19-00611
|
Site Preparation | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PEND |
Andy J. Long
|
|
|
Reviewed ESC plan with GC-RP Gene and homeowner Clayton.
Will install silt fence along lower perimeter, construction entrance.
Plan is to construct rear swales before vertical construction to handle stormwater.
Will follow up once silt fence is installed.
|
Issue & PRINT permit SFD | | | 5/30/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/26/2019 | | 2/26/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Application received | | | 2/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 22 2019 12:39PM
|