General Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PART |
Michael Zawacki
|
|
|
Most homes are partially framed, all foundation and driveway work completed, kid pool washouts. Lots of building matrtial and debris laying around site, will need a good cleanup.
|
General Inspection | 7/1/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing 3 homes. All concrete work except one home has been completed, washout on site. On lot has backfill, has silt fence installed. Roads and sidewalks swept, trash all contained.
|
Complaint Inspection | 6/25/2020 | 6/25/2020 | 7/1/2020 | P | PASS |
Andy J. Long
|
|
|
Site was cleaned up in response to complaint. No more dump washout observed.
Storm drains on Triumph have sediment protection, lined concrete washout installed.
Notified RP to fix lining on washout that is beginning to sag.
follow up inspeciton scheduled. Will increase inspection frequency at this site to ensure compliance.
|
General Inspection | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Michael Zawacki
|
|
|
Road and sidewalks completed. Lots are starting to grow weed cover. No issues.
|
General Inspection | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Road is paved and open for through traffic. Landscaper on site doing work at entrance. Trees palnted and he is starting to lay sod. No home activity, no activity on any lots.
|
Aging Inspection | 2/19/2020 | 2/19/2020 | 2/19/2020 | | PASS |
Michael Zawacki
|
|
|
Roadbed fro Cyrus is completed, sidewalks done, road not paved. Utilities have been installed. 2 washouts on site. No home activity.
|
General Inspection | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Michael Zawacki
|
|
|
Suez on site. Some track utilities equipment also on site. No ESC issues.
|
General Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Trench work looks completed. Road and sidewalk have been patched. Site is bare, few stockpiles. Equipment on site, not active at time of inspection.
|
General Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Michael Zawacki
|
|
|
Site is sitting idle, Materials for waterl lines staged on site. Lots of stockpiles and no ground cover. No dust at time of inspection.
|
General Inspection | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PART |
Michael Zawacki
|
|
|
Message sent to excavator. New construction entrance needed. Stockpile will need to be stabilized or covered if idle for 2 weeks.
|
General Inspection | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Michael Zawacki
|
|
|
No new activity, no issues.
|
Site Preparation | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PART |
Michael Zawacki
|
|
|
Perimeter BMPs and entrance installed. Inlets on Virginia still need protection. Called Dave and left message, also spoke to Gene and John. Gave John Brown ok to go, limit of his work is to tile the ditch and add some boxes. Site is not being stripped.
|
General Inspection | 4/3/2019 | 4/4/2019 | 4/3/2019 | P | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 4/1/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 4/1/2019 | | DONE |
|
|
|
|
Application received | | | 3/29/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/29/2019 | | 3/29/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Certified stormwater/ESC team. Site preparation inspection required.
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
as per Andy Long-only need an ESC permit no grading permit required
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 3/29/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
called David to let know permit is ready
|