Site Final | 8/12/2019 | 8/16/2019 | 8/16/2019 | A | PASS |
Andy J. Long
|
|
|
Temporary BMPs removed, work and staging areas cleaned up. Dog Island open for human and canine recreation. No ESC corrections. Boise Parks will control disturbed area in the staging area.
|
Site Final | 8/6/2019 | 8/9/2019 | 8/12/2019 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Andy J. Long
|
|
|
WIP at Dog Island.
All ecoblocks and ramps are installed. Crews working installing culvert from pond outflow to Amercan. Large capacity pump was not working, and is only used to deal when pond levels rise. Smaller pumps are discharging to grass for infiltration. Water in outlet is clear with no turbidity.
Work area clean, concrete washout utilized. No corrections requested. Spoke with RP Travis and onsite manager Abel
|
(F) Reprint permit | | | 5/6/2019 | | |
|
|
|
|
(F) Reprint permit | | | 5/6/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/6/2019 | | DONE |
|
|
|
|
Application received | | | 4/4/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/4/2019 | | 4/4/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved. Site preparation inspection is required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 4/4/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 4/4/2019 | | DONE |
|
|
|
|