Site Final | 12/18/2019 | 12/19/2019 | 12/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | FAIL |
Michael Zawacki
|
|
|
Sidewalk is blocked and site is a mess. No one on site and should be cleaned up for weekend. Message sent to RP.
|
Random Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | DONE |
Michael Zawacki
|
|
|
neighbor to S complaining of runoff at construction site onto their property Phone #: ###-#### 1745 Mockbee is over watering back yard, causing rills running down. Construction site has no running water.
|
Site Preparation | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Michael Zawacki
|
|
|
Dave Phone #: ###-#### Left message with RP. BMPS HAVE ALREADY BEEN INSTALLED. I SUGGESTED SILT FENCE PERIMETER TO PROTECT NEIGHBORS LANDSCAPING AND PREVENT FUTURE ISSUES AND TO WATCH THE BLOCKSOME INLET BELOW.
|
Issue & PRINT permit SFD | | | 6/12/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/14/2019 | | 5/14/2019 | | DONE |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Application received | | | 4/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 6 2019 11:50AM
|