Site Final | 4/16/2020 | 4/17/2020 | 4/20/2020 | P | PASS |
Michael Zawacki
|
|
|
Screened- Cody Phone #: ###-#### Still some materials staged in lot, all outside work completed.
|
General Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
All external work and parking lot work looks completed. Some shingles, pieces of entrances, and equipment still staged in parking lot.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | | PASS |
Andy J. Long
|
|
|
No significant disturbance or excavated area. Interior demo work occuring. No trackout or other issues. Pile of sand located south of building in parking lot, no sediment protection installed on private storm drain. Will continue to monitor work.This permit issued with GRD, builing demo and TIs issued seperately.
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | | PASS |
Michael Zawacki
|
|
|
All ground disturbances and parking lot work completed. Street lights still need to be installed.
|
Site Preparation | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Michael Zawacki
|
|
|
Parking lot has been removed and is below grade. New parking islands being installed, did not see a concrete washout or any washout dumped on site. Nothing leaving site at time of inspection. Some areas of lot have been sawcut and are still open to traffic.
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 9/6/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/24/2019 | | 4/24/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Certified Plan Desinger listed, need to provide a certified ESC Responsible Person with operational control at the site. Site preparation inspection REQUIRED.
|
Application received | | | 4/10/2019 | | |
|
|
|
|