DOC - Permit Finaled | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/22/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Michael Zawacki
|
|
|
Last section of greenbelt on hold due to high water. Area excavated is about even with creek elevation and full of water. Met with GC Rusty, is moving equipment of site, not expecting rivers to drop for at least 6 weeks.
|
Site Preparation | 4/17/2019 | 4/18/2019 | 4/22/2019 | A | PASS |
Andy J. Long
|
|
|
Concrete washout pan installed in MA Williams park parking lot. WIP on path.
RP needs to schedule site final.
|
Permit Ready to Issue | | | 4/17/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/17/2019 | | DONE |
|
|
|
spoke with Rusty informing him that this permit is ready and the fee amount due for issuance
|
Issue & PRINT permit COM | | | 4/17/2019 | | DONE |
|
|
|
|
Application received | | | 4/16/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 4/16/2019 | | 4/16/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Double fee for starting without permit, special site fee for illicit uncontained washout violation.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2019 | | |
|
|
|
|