General Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
BMPs installed, no workers on site.
|
Site Preparation | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Michael Zawacki
|
|
|
Permit displayed, rock check bags below site, extra BMPs on site. Watch for trackout during excavation. Downhill is vegetated in back. DI bag still needed, owner aware.
|
Site Final | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | CANC |
Michael Zawacki
|
|
|
Needed prep not final.
|
Issue & PRINT permit SFD | | | 5/9/2019 | | DONE |
|
|
|
|
Application received | | | 5/6/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/6/2019 | | 5/6/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Site map and narrative provided. Site preparation inspection is required.
|