Site Final | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/30/2019 | 9/3/2019 | 9/4/2019 | P | PASS |
Andy J. Long
|
|
|
Clean site, BMPs installed. Concrete washout containment provided. Need to post City of Boise ESC permit sign
|
Random Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | FAIL |
Andy J. Long
|
|
|
No ESC permit posted. No required site preparation inspection scheduled.
Site is clean, no discharges. Concrete washout containment provided.
|
Permit Ready to Issue | | | 7/24/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/24/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/30/2019 | | 5/30/2019 | | DONE |
Michael Zawacki
|
|
|
RP needed, site prep required.
|
Application received | | | 5/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2019 3:06PM
|