Site Final | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Andy J. Long
|
|
|
Foundation poured. No major trackout. Utilized lined concrete washout. Will need to sweep up after backfill
|
Issue & PRINT permit SFD | | | 6/13/2019 | | DONE |
|
|
|
|
Application received | | | 5/22/2019 | | |
|
|
|
|