General Inspection | 6/5/2020 | 6/5/2020 | 6/8/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Michael Zawacki
|
|
|
Landscaping completed.
|
General Inspection | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | FAIL |
Michael Zawacki
|
|
|
Reoccuring rilling along common driveway everytime it rains. Sent message to RP. Asked for them to install checks or wattle to divert water into lot and sweep sidewalk.
|
General Inspection | 5/15/2020 | 5/15/2020 | 5/19/2020 | | PASS |
Andy J. Long
|
|
|
WIP on exterior finishes. Driveway is paved, no dirty runoff. Clean site.
|
General Inspection | 4/30/2020 | 4/30/2020 | 4/30/2020 | | PASS |
Andy J. Long
|
|
|
WIP on exterior finish. Driveway is already paved and front slope below is vegetated. No violations observed
|
General Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | | PASS |
Michael Zawacki
|
|
|
No runoff from home, exteror looks completed. Lower lot has vegetation growing.
|
General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | | PASS |
Michael Zawacki
|
|
|
Home has gutters, no rilling on lot. Some rills on bare area along common drive, no issues.
|
General Inspection | 3/12/2020 | 3/12/2020 | 3/16/2020 | | FAIL |
Michael Zawacki
|
|
|
Message and picture sent to Rod. Rilling along driveway and dirt blown out onto sidewalk.
|
General Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Andy J. Long
|
|
|
No violations observed. Driveway has been completed. Home owner also owns the lower lot so can be used for staging or stormwater retention.
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PART |
Michael Zawacki
|
|
|
Mini excavator hauling rock for drainage field is kicking up lots of dust.
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Grade crew has mini ex doing some elevations. Area prepped for pour. No esc issues.
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PEND |
Michael Zawacki
|
|
|
Running trucks from lot and up road across street. Lots of trackout, need tyo sweep end of work day.
|
General Inspection | 8/19/2019 | 8/23/2019 | 8/23/2019 | P | PART |
Michael Zawacki
|
|
|
Concrete washout is overflowing.
|
General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PEND |
Andy J. Long
|
|
|
WIP on foundation excavation. No trackout, no discharges, dry conditions.
Advance correction request to make sure there is a lined/leakproof concrete washout. It appears they will have some concrete placed this week and a washout was not yet staged.
|
Site Preparation | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with Rod the builder on site. Lot has vegetated lot below it, shares driveway with neighbors. Currently excavating for walls. Water should be hooked up on 7/30 and will spray for dust. They are sweeping street and sidewalk
|
(F) Reprint permit | | | 7/24/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/22/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/22/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/10/2019 | | 6/10/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required. RP must be on site with authority to make any changes needed.
|
Application received | | | 6/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2019 9:04AM
|