General Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | | PASS |
Michael Zawacki
|
|
|
Home is framed and tyvek wrapped. Site is clean and contained.
|
General Inspection | 7/31/2019 | 7/31/2019 | 8/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured and washout used. Wattle on downhill slope, buffer left in front of project perimeter drain.
|
Site Preparation | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Andy J. Long
|
|
|
Note: initial site preparation inspection was logged under the ESC permit for Rock Placing Co. phase of project. Site prep for this permit for the SFH was completed 7/10.
All other SFH inspections will be completed on this permit.
|
Permit Ready to Issue | | | 7/10/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/10/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/13/2019 | | 6/13/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
Clayton Conners RP is expired, sent him message to register for class. OK to issue permit when he has registered and has class scheduled.
|
Application received | | | 6/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 12 2019 11:55AM
|