General Inspection | 5/20/2020 | 5/20/2020 | 5/20/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Site Preparation | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Michael Zawacki
|
|
|
Entrance has been cut through berm, lined with rock. Excavator on site, trees cut and in pile.
|
Site Preparation | 8/27/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Dennis - ###-####
permission to start tree removal and initial grading on 8/27. RP states wattles are installed and permit sign posted. Will install construction entrance after tree removal/lot grubbing.
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 8/26/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/9/2019 | | 8/9/2019 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Application received | | | 7/29/2019 | | |
|
|
|
|