General Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | PASS |
Michael Zawacki
|
|
|
Home is completed and landscaped.
|
General Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with owner and excavator at site. Trash crew was told to get to site and clean, blocking work area for excavator. Will make sure to sweep boot tracked mud off sidewalk.
|
General Inspection | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Michael Zawacki
|
|
|
Lot contained.
|
BMP Violation | 10/17/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Michael Zawacki
|
|
|
No corrections made
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | FAIL |
Michael Zawacki
|
|
|
Started on foundation. Looks like some washout or pump truck was leaking on site. Picture sent to RP, follow up scheduled.
|
Site Preparation | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Michael Zawacki
|
|
|
Perimeter controls installed around site. Permit displayed. Will need construction entrance once work begins.
|
Issue & PRINT permit SFD | | | 9/13/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/16/2019 | | 8/16/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Application received | | | 8/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2019 8:59AM
|