General Inspection | 7/8/2020 | 7/8/2020 | 7/8/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Site Preparation | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with foreman on site. Scope of work for first phase is to dredge silt out of pool right along warm springs avenue. Water is being pumped into vegetative area to west, no water wikll make it to river.
|
Site Preparation | 9/27/2019 | 10/1/2019 | 9/30/2019 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Andy J. Long
|
|
|
|
Application received | | | 9/17/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 9/17/2019 | | 9/17/2019 | | DONE |
Michael Zawacki
|
|
|
Waiver approved. Site prep required.
|
Override - Parcel Holds | | | 9/17/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
MET- NEED VALID RP
|
Telephone call | | | 9/17/2019 | | DONE |
|
|
|
Left message on ###-#### informing applicant that RP is needed and what the fees are for the permit
|
Telephone call | | | 9/17/2019 | | DONE |
|
|
|
Andy B. call to give the correct number of the RP, applicant had wrote it wrong on the application.
|
Override - Parcel Holds | | | 9/17/2019 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 9/17/2019 | | DONE |
|
|
|
|