General Inspection | 8/7/2020 | 8/7/2020 | 8/11/2020 | P | PASS |
Michael Zawacki
|
|
|
Sidewalks and curbing completed. Thueson is on site starting to pave. Large stockpiles on site.
|
General Inspection | 6/2/2020 | 6/3/2020 | 6/4/2020 | P | PASS |
Michael Zawacki
|
|
|
Thueson on site, just completed sewer work in Canal street. Road is scheduled to be patched tommorow. Seepage beds have been installed. Entire site is graded and there is some stock piles. Water truck on site, will need to continue to watch for dust. Sweeper on site, entrance will need to be freshened up.
|
Permit Ready to Issue | | | 3/4/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/4/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/4/2019 | | 10/4/2019 | | DONE |
Michael Zawacki
|
|
|
RP Needed.
Site prep inspection required.
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2019 11:24AM
|