General Inspection | 7/9/2020 | 7/9/2020 | 7/9/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/3/2020 | 4/3/2020 | 4/3/2020 | P | PASS |
Michael Zawacki
|
|
|
No blowouts below home. Masons and stucco have made a mess out front.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Michael Zawacki
|
|
|
Site is dry. Some small rills from where water is coming of deck above, wattles haven't been undercut or had sediment go over top. No current issues.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | CANC |
Michael Zawacki
|
|
|
entry error
|
General Inspection | 1/24/2020 | 1/24/2020 | 1/24/2020 | P | PASS |
Michael Zawacki
|
|
|
No current issues. Will need to watch hillside until gutters are installed.
|
General Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing. Vehicles parked half on asphalt and dirt. Some palets for retaining wall stored on street. Some loose trash that looks like it fell out of someoned truck. No trackout on road.
|
General Inspection | 11/15/2019 | 11/15/2019 | 11/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with owner Jeff on site. Concrete washout is being hauled back to plant. Street and gutter need to be swept where materials being stored along road, some tracking from retreiving materials.
|
Site Preparation | 10/11/2019 | 10/15/2019 | 10/14/2019 | A | PASS |
Michael Zawacki
|
|
|
WIP on wall. Wattle and natural buffer on hillside below. Wattle protecting neighbors prperty line. Site is below road.
|
Issue & PRINT permit SFD | | | 10/7/2019 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/27/2019 | | 9/27/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Application received | | | 9/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 23 2019 2:33PM
|