General Inspection | 8/11/2020 | 8/11/2020 | 8/12/2020 | | PASS |
Michael Zawacki
|
|
|
Work on concrete sidewalk and driveway, using washout down on eyrie phase. No issues.
|
General Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with RP Greg while at site. Had worker clean garbage off hillside. Everything in good shape.
|
General Inspection | 5/21/2020 | 5/21/2020 | 5/28/2020 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Michael Zawacki
|
|
|
Site is clean. Perimeter controls all the way around. All workers parked on street.
|
General Inspection | 4/15/2020 | 4/15/2020 | 4/15/2020 | P | PASS |
Michael Zawacki
|
|
|
Home is framed. No loose trasj at site. Driveway is clean pit run, perimeter controls installed.
|
Tracking Control | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PEND |
Andy J. Long
|
|
|
Framing crane caused some trackout. Onsite crew member cleaning it up - stated that builder is ordering more gravel/rock for construction entrance & trackout prevention.
|
General Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP on forms and foundation, large washout on site. Large pile of backfill, will need to watch for runoff or seeing if it needs to be stabalized. Trailers in dirt, is currently dry.
|
Site Preparation | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Michael Zawacki
|
|
|
Plan to start Monday, Spiers is excavator. Wattle on back and downhill sides. Will install snake bags below limits of disturbance. Washout will be dug and placed where it won't receive water. Has met Colin, knows to keep clean.
|
General Inspection | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Michael Zawacki
|
|
|
No issues on hillside. All materials on site, no tracking. No loose or blowing garbage.
|
Site Preparation | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
Michael Zawacki
|
|
|
Met foreman at site. Will install wattle along back and side perimeter. Will put snake bags in gutter, DIs are down hill and already protected. Will not start for a few weeks. The concrete is scheduled out and they don't want to leave a hole exposed while waiting.
|
Site Preparation | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | DONE |
Michael Zawacki
|
|
|
Email sent to RP and GC
|
Permit Ready to Issue | | | 1/16/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 1/16/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/15/2019 | | 10/15/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
Plan designer has been listed as RP
|
Application received | | | 10/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 11 2019 11:20AM
|