Site Final | 12/4/2019 | 12/4/2019 | 12/11/2019 | P | PASS |
Andy J. Long
|
|
|
Scope of work for Master Excavation is complete, new storm drain and oil & grease trap is installed. Perimter wattle adjacent to canal is installed until further stabilization.
Arbor View faciilty management will have site landscaped/stabilized. Master Excavation to clean up grout washwater that was dump.
|
Site Preparation | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Andy J. Long
|
|
|
2 PM
Reviewed site plans with Master Excavation and Boise Canal Company. Water is flowing in nearyby Sand Creek, Boise Canal Company is not flowing.
Requested stockpile protection and follow up inspection for post construction controls after project. Approved for construction.
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/23/2019 | | DONE |
|
|
|
spoke with Scott informing him this permit is ready and the fee amount due for issuance
|
Application received | | | 10/22/2019 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/22/2019 | | 10/22/2019 | | PASS |
Andy J. Long
|
|
|
Certified RP listed; site preparation inspection required.
|