Permit NumberESC19-01496
StatusFinaled
Name KENNETH L LONGWILL
Site Address 5122 W STOKER LN
Project NameArbor Crossing storm drain
Customer Number 
ePlanReviewNo
Description
existing parking lot strorm drain retrofit. Installation of sand & grease trap pretreatment and new pipe to Boise Valley Canal. PW drainage exempted for permit since not a new system. ESC site preparation inspection required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/4/201912/4/201912/11/2019PPASS
DetailsAndy J. Long
Scope of work for Master Excavation is complete, new storm drain and oil & grease trap is installed. Perimter wattle adjacent to canal is installed until further stabilization.

Arbor View faciilty management will have site landscaped/stabilized. Master Excavation to clean up grout washwater that was dump.
Site Preparation10/28/201910/28/201910/28/2019PPASS
DetailsAndy J. Long
2 PM

Reviewed site plans with Master Excavation and Boise Canal Company. Water is flowing in nearyby Sand Creek, Boise Canal Company is not flowing.

Requested stockpile protection and follow up inspection for post construction controls after project. Approved for construction.
Permit Ready to Issue  10/24/2019 DONE
Issue & PRINT permit COM  10/24/2019 DONE
Telephone call  10/23/2019 DONE
spoke with Scott informing him this permit is ready and the fee amount due for issuance
Application received  10/22/2019  
Routing - Erosion and Sediment10/22/2019 10/22/2019 PASS
DetailsAndy J. Long
Certified RP listed; site preparation inspection required.