General Inspection | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Michael Zawacki
|
|
|
All water work completed. Stark landscape on site, getting sprinkler zones set. Scheduled for sod nex week.
|
General Inspection | 2/7/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Michael Zawacki
|
|
|
No earth disturbing activity. Pitrun, rock, and ecology blocks have been stockpiled. One track steer and tracked dumper on site. No workers.
|
General Inspection | 1/23/2020 | 2/4/2020 | 2/7/2020 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Andy J. Long
|
|
|
Randy ###-####
Met with Joel project manager for site. No activity at time of inspection.
Workers will use the existing paved parking lot adjacent to site so access to site should be limited. Site has perimter construction fence and trees to be remain have protective perimeter fences installed. Project will be scoop down 6" inches and removing existing and will replace with an improved topsoil. Additional plantings and sidewalks will be installed and steps down into Quinn's Pond.
Construction entrance installed and permit sign is posted. Turbidity curtain will be installed prior to activity along the bank of the pond. Leakproof concrete washout is to be installed prior to any concrete work.
Approved for construction.
|
Issue & PRINT permit COM | | | 1/8/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/30/2019 | | 10/30/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Application received | | | 10/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2019 12:02PM
|