Site Preparation | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Andy J. Long
|
|
|
10 AM with RP Roger and Brandt Hospitality superintendant Angela ###-####
Two construction entrances, silt fence perimeter on 3 lower sides of site, placed pit run in site to keep mud down. Grass and trees around the cleared area have been preserved. Water truck, sweeper, and dumpster have been staged. Receiving storm drains (private & MS4) have sediment protection installed. Responsible Person on duty. Will post Boise ESC permit sign on Rifleman and on trailer.
Approved for construction,
|
Issue & PRINT permit COM | | | 2/7/2020 | | DONE |
|
|
|
forgot to be issued
|
Routing - Erosion and Sediment | 10/31/2019 | | 10/31/2019 | | PASS |
Andy J. Long
|
|
|
Site preparation inspection with Boise ESC division is required prior to earthwork and BMP installation per approved ESC plan/SWPPP. Need to list Boise certified ESC Responsible Person.
|
Application received | | | 10/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 29 2019 8:46AM
|