General Inspection | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PASS |
Michael Zawacki
|
|
|
Footings poured, no dumped washout.
|
General Inspection | 5/6/2020 | 5/7/2020 | 5/13/2020 | A | PASS |
Andy J. Long
|
|
|
post permit sign
BMPs installed. No activity at time of inspection. Clean site.
|
Site Preparation | 5/4/2020 | 5/5/2020 | 5/6/2020 | A | PASS |
Andy J. Long
|
|
|
Scott Phone #: ###-####
BMPs installed (sediment protection on receiving storm drains, construction entrance)
|
Permit Ready to Issue | | | 4/17/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/17/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/26/2019 | | 11/26/2019 | | PASS |
Andy J. Long
|
|
|
ESC site preparation inspection is required at beginning of project. Certified RP listed.
|
Application received | | | 10/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2019 2:26PM
|