General Inspection | 8/3/2020 | 8/7/2020 | 8/7/2020 | A | PASS |
Michael Zawacki
|
|
|
No activity. Silt fence still along north perimeter. Site is all overgrown, test pit still open, no equip,ment on site.
|
Complaint Inspection | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PART |
Andy J. Long
|
|
|
code complaint about equipment staged for long periods of inactivity
Equipment is staged/parked on private property. ESC permit sign posted, BMPs installed.
No activity at time of inspection but crews have recently resumed work at site. Disturbed areas are kicking up dust blowing off site. Need to wet down to provide a crust.
Notified RP Annie and she will have crew wet down the dirsturbed/loose soil area and sweep the sidwalk gutter at entrance - there is minor trackout occuring
|
General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Michael Zawacki
|
|
|
Nontrenched silt fence along north perimeter. Crushed entrance installed, has wattle at end and gravel snake bags on road. Large excavated pile from what looks like test pit or seepage. If idle stockpile will need to be covered. Small section of site excavated a few feet below grade.
|
Permit Ready to Issue | | | 1/16/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 1/16/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/19/2019 | | 11/20/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Need to designate certified RP. Site preparation inspection is REQUIRED.
|
Application received | | | 11/4/2019 | | |
|
|
|
|