General Inspection | 3/23/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Andy J. Long
|
|
|
WIP on police substation. No trackout or discharges from site. RP on duty.
3C utiliity contractor was working in ROW south of site on 18 & 17th. Observed slurrry in the gutter from boring. Returned to site to find that the slurry had been cleaned up and none had entered the storm drain.
|
Permit Ready to Issue | | | 3/5/2020 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 3/5/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/30/2020 | | 1/30/2020 | | DONE |
Andy J. Long
|
|
|
Work started without permit.
|
Routing - Erosion and Sediment | 11/18/2019 | | 11/18/2019 | | DONE |
Michael Zawacki
|
|
|
RP needed
|
Application received | | | 11/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 8 2019 11:09PM
|