General Inspection | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Michael Zawacki
|
|
|
Crew on site setting bar and forms, no washout at site. Water is being pumped from trench into Harris Ponds. Trench is only to keep water out of neighboring property and has no construction activity. Talked to Jerrid Wieting foreman for forge. Talked to Rex with Knife River and was given permission to pump to holding ponds. No issues with dewatering
|
General Inspection | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | PASS |
Michael Zawacki
|
|
|
Lots of fill has brought up elevation of site. Lots of standing water in lot to north, do not know if it has been an issue before, just noting.
|
General Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | PASS |
Michael Zawacki
|
|
|
Hauling in material to raise site elevation. No trackout, no issues at site.
|
Site Preparation | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Michael Zawacki
|
|
|
All pemit issues have been resolved. Rough grading completed. I hung up permit on job board. No esc issues.
|
Permit Ready to Issue | | | 3/27/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/27/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/15/2019 | | 11/15/2019 | | DONE |
Michael Zawacki
|
|
|
RP Needed.
Site prep inspection required.
|
Application received | | | 11/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 9 2019 8:13AM
|