General Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PART |
Michael Zawacki
|
|
|
WIP on framing. Some materials blocking sidewalk, some boot tracked dirt.
|
General Inspection | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | FAIL |
Michael Zawacki
|
|
|
Some dirt and trackot in front. Let framers know it needs to be swept.
|
General Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Michael Zawacki
|
|
|
No workers on site at time of inspection. Framing has begun. Building materials stored on road.
|
General Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | FAIL |
Michael Zawacki
|
|
|
Rock wall completed. Concrete crew on site setting forms. Road and sidewalk covered in boot tracking. Message sent to RP.
|
Site Preparation | 3/27/2020 | 3/30/2020 | 3/31/2020 | A | PASS |
Andy J. Long
|
|
|
BMPs installed. ESC permit sign posted. Need to change ESC permit into Matt Brown construction.
Site is in compliance. Approved for construction.
|
Site Preparation | 3/26/2020 | 3/26/2020 | 3/27/2020 | A | CANC |
Andy J. Long
|
|
|
rescheduled for monday 3/30
|
Issue & PRINT permit SFD | | | 3/25/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/4/2019 | | 12/4/2019 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
|
Application received | | | 11/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 25 2019 2:51PM
|