Site Preparation | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | PASS |
Michael Zawacki
|
|
|
Work area is all contained, site below grade. Issues to watch for will be dust and trackout.
|
Site Preparation | 4/3/2020 | 4/6/2020 | 4/6/2020 | A | CANC |
Michael Zawacki
|
|
|
|
Permit Ready to Issue | | | 3/30/2020 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/30/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/18/2019 | | 12/18/2019 | | DONE |
Michael Zawacki
|
|
|
RP needed. Site is in existing construction yard.
|
Application received | | | 12/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 13 2019 7:59AM
|