Permit Information
Permit NumberESC19-01727
StatusIssued
Name JOHN LAUDE JR
Site Address 6901 W LAKE HAZEL RD
Project NameBARNWOOD 2
Customer Number 
ePlanReviewNo
Description
Building a residential subdivision
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/27/20207/27/20207/27/2020PPASS
DetailsMichael Zawacki
No work on phase.
General Inspection7/1/20207/1/20207/1/2020PPASS
DetailsAndy J. Long
No dust or trackout. Dry conditions. WIP on phase 1 road paving in Barnwood by Knife River.
General Inspection5/27/20205/27/20205/27/2020PPASS
DetailsMichael Zawacki
North of lake hazel.
Road and sidewalk completed. No activity, starting to get weed coverage.
Tracking Control5/13/20205/19/20205/21/2020ACANC
DetailsAndy J. Long
General Inspection5/12/20205/12/20205/13/2020PPART
DetailsAndy J. Long
WIP on subdivsion grading and infrastructure. No wind blown dust observed.

Correction request to sweep up apron and Lake Hazel sent to RP John. Follow up next week.
General Inspection4/7/20204/21/20204/23/2020PPASS
DetailsAndy J. Long
Rough grading complete. NO activity at time of inspection. Still need to install utilities and infrastructure. NO trackout to Lake Hazel, no wind blown dust observed.
Site Preparation3/30/20204/2/20204/7/2020PPASS
DetailsAndy J. Long
Conference3/30/20203/30/20203/30/2020PDONE
DetailsAndy J. Long
Phone discussion about crews beginning grading on this phase this week. Site preparation inspection scheduled.

Access phase is through Barnwood #1, no new entrances to Lake Hazel or Cole. No adjacent surfaces waters or perimter BMPs other than staying within clearing limits.

Fugitive dust control will be top priority for ESC on this site.
Permit Ready to Issue  2/19/2020 DONE
Issue & PRINT permit SFD  2/19/2020 DONE
Routing - Erosion and Sediment1/16/2020 1/16/2020 DONE
DetailsMichael Zawacki
Phase 2 east of existing work. Site prep inspection required to be sure all current and future work in compliance and shared BMPs are working.
Application received  12/17/2019 DONE
Application submitted via PDS Online on Dec 17 2019 12:28PM