Site Preparation | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Michael Zawacki
|
|
|
Met with Robert Bruno on site. Has perimeter wattle along bottom, lined washout, and lined entrance. Storing backfill on neighboring parcel, is owner. ] Crew setting forms.
|
Issue & PRINT permit SFD | | | 2/18/2020 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/3/2020 | | 1/3/2020 | | DONE |
Michael Zawacki
|
|
|
Site prep required.
|
VOIDED CHANGE STATUS | | | 1/2/2020 | | DONE |
|
|
|
SEE BLD20-00014 (should of been a 404 application)
|
Change Status (ISS) | | | 1/2/2020 | | DONE |
|
|
|
had to change to issued - only option. BLD in review
|
Application received | | | 12/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 18 2019 4:37PM
|